Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Fix tiny typo on infrastructure measures #1

Open
wants to merge 1 commit into
base: dev
Choose a base branch
from
Open
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Original file line number Diff line number Diff line change
Expand Up @@ -255,7 +255,7 @@ Because this standard lays out a consequential methodology for calculating the e
- Power Purchase Agreements (PPAs)
- Renewable Energy Credits (RECs)

### Infrastructure Meaures
### Infrastructure Measures
**“Infrastructure measures”** including any infrastructure that integrate renewables via a "direct wire connection" (e.g. a datacenter with solar panels on the roof and a battery storage located onsite). This is conceptually closer to a Microgrid, where there is a higher % of renewable energy usage than the local grid carbon intensity.


Expand Down