Update dependency: deps/haskell-backend_release #2448
test.yml
on: pull_request
Stack / Unit Tests
11m 2s
Formatting and Style
44s
Matrix: Nix / All Tests
Annotations
6 errors
Stack / Unit Tests
Process completed with exit code 1.
|
Nix / All Tests (MacM1, self-macos-12, aarch64-darwin)
Process completed with exit code 1.
|
Nix / All Tests (macos-12, macos-12, x86_64-darwin)
Canceling since a higher priority waiting request for 'Build + Test-_update-deps/runtimeverification/haskell-backend' exists
|
Nix / All Tests (macos-12, macos-12, x86_64-darwin)
The operation was canceled.
|
Nix / All Tests (self-hosted, linux, normal, Ubuntu-22.04, x86_64-linux)
Canceling since a higher priority waiting request for 'Build + Test-_update-deps/runtimeverification/haskell-backend' exists
|
Nix / All Tests (self-hosted, linux, normal, Ubuntu-22.04, x86_64-linux)
The operation was canceled.
|