Skip to content

Snowbridge v2 - Outbound Queue #17829

Snowbridge v2 - Outbound Queue

Snowbridge v2 - Outbound Queue #17829

Triggered via pull request January 9, 2025 16:41
Status Failure
Total duration 30m 56s
Artifacts

tests-linux-stable.yml

on: pull_request
preflight  /  preflight
49s
preflight / preflight
preflight  /  ci-versions
1m 6s
preflight / ci-versions
Matrix: test-linux-stable-no-try-runtime
Matrix: test-linux-stable
test-linux-stable-int
9m 56s
test-linux-stable-int
test-linux-stable-runtime-benchmarks
26m 39s
test-linux-stable-runtime-benchmarks
All tests passed
0s
All tests passed
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 4 warnings
test-linux-stable (1/3, parity-oldlinux)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
test-linux-stable (1/3, parity-oldlinux)
The self-hosted runner: gha-oldkernel-runner-m6l2 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
All tests passed
Process completed with exit code 1.
preflight / preflight
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
preflight / ci-versions
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-linux-stable (1/3, parity-oldlinux)
Docker pull failed with exit code 1, back off 6.436 seconds before retry.
All tests passed
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636