Skip to content

Feat/baseten integration #92

Feat/baseten integration

Feat/baseten integration #92

Triggered via pull request October 21, 2024 13:12
Status Failure
Total duration 58s
Artifacts

test-and-lint.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.10)
Process completed with exit code 2.
test (3.12)
The job was canceled because "_3_10" failed.
test (3.12)
Process completed with exit code 2.
test (3.11)
The job was canceled because "_3_10" failed.
test (3.11)
The operation was canceled.
test (3.11)
Process completed with exit code 2.