Skip to content

Rework handling of the pebble_ready event #710

Rework handling of the pebble_ready event

Rework handling of the pebble_ready event #710

Triggered via pull request November 23, 2023 18:04
Status Cancelled
Total duration 28m 43s
Artifacts 2

integration_test.yaml

on: pull_request
integration-tests  /  ...  /  Get runner image
3s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
8s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
8s
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
2m 31s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration-tests / Build rock / Build rock (discourse_rock)
Canceling since a higher priority waiting request for 'operator-workflows-Integration tests-integration-tests-refs/pull/146/merge-integration' exists
integration-tests / Build rock / Build rock (discourse_rock)
The operation was canceled.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
discourse-k8s-charm Expired
7.38 MB
discourse-k8s-images Expired
1 Byte