You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
As a member of the AEDP team I need to prepare our pattern for review with the Design System Council, so that we can finalize it before it goes through the staging review in collab cycle before adoption. Required attendees are as follows:
Becky
Matt
RyanT
MarthaW
ShaneS
DanielleT
Background
ACs
Schedule meeting with mini DSC crew
Create needed artifacts
draft governance
prototype
deck
Our pattern has been presented for feedback to the mini DSC
Review needed by
VA Product Owner
Product Manager
UX Research Team
Engineering Team
Definition of Done
Documentation has been updated, if applicable.
Acceptance Criteria in related issue are met.
Reviewers have approved.
The text was updated successfully, but these errors were encountered:
User Story
As a member of the AEDP team I need to prepare our pattern for review with the Design System Council, so that we can finalize it before it goes through the staging review in collab cycle before adoption. Required attendees are as follows:
Background
ACs
Review needed by
Definition of Done
The text was updated successfully, but these errors were encountered: